Grass Conversion
For a limited time, City of Sacramento customers can receive $2.50 per square foot to replace grass with water-efficient landscaping. The increased grass conversion rebate is available for applications submitted Sept. 1, 2026, through Feb. 28, 2027.
Rebates are available to City of Sacramento customers to replace existing grass with water-efficient landscaping.
For a limited time, customers can receive $2.50 per square foot for eligible grass conversions. Applications must be submitted by Feb. 28, 2027.
Single-family customers can receive a maximum rebate of $5,000 for grass converted in the front, side and back yards.
A rebate of up to $200 is also available to single-family customers to help design a front yard landscape.
Multi-family properties of three or more units, commercial and institutional customers can receive a maximum rebate of $50,000 for eligible expenses and can use the rebate for grass conversion, irrigation upgrades or a combination of both.
To be eligible for a rebate, customers must receive approval from City staff on all projects BEFORE they begin.
Project requirements
Grass conversion projects must include:
- Noninvasive, drought-tolerant plants (very low to low water use), including groundcovers, shrubs and trees
- At least 60 percent plant coverage after plants are mature
- A minimum of five plants
- A drip irrigation system with an EPA WaterSense-certified smart controller OR no irrigation system if the customer waters by hand
- Organic or inorganic mulch, which must be spread 2 to 5 inches under trees and shrubs and must be 6 inches or less in diameter
What’s not eligible for reimbursement:
- Projects that have already been completed
- Artificial grass
- Labor that is done by a non-licensed (C27) contractor
- Tree removal equipment rental and tool purchases
- Herbicides
- Cardboard
- Soil amendments
- Border materials
- Boulders
- Plants in raised beds or containers
How to apply
- Submit a completed grass conversion rebate application. Mail or email photos of existing turf, plant coverage worksheet and landscape plan.
- Wait for approval from water conservation staff.
- Schedule a pre-inspection before beginning your project.
- Complete your landscape conversion project and submit receipts and a photo within 120 days of project approval.
- Schedule a post-inspection from water conservation staff. Itemized receipts will be reviewed and verified by staff. Following review, projects must be inspected after completion.
- Receive a rebate check, usually within 12 weeks of your post-inspection appointment and approval.
For all customers
Single-family/duplex customers
Multi-family/commercial/institutional customers
Contact us
For more information about grass conversion rebates or if you have questions about your application or the application process, email riverfriendly@cityofsacramento.org or call 916-808-1337.
City of Sacramento Department of Utilities
Water Conservation
5730 24th Street, Building 22
Sacramento, CA, 95822
Rebates are only available while funds last.
ON THIS PAGE