Residential Fee Information – January 22, 2024 to June 30, 2024
Call (916) 808-7890 for Department of Utilities development-related fee questions.
Fees are subject to change on every July 1st or at any time.
For current fees visit the City's Fee and Charge Database.
Full Cost Recovery = $164 per hour
Single-family residence = $70.00
$201.00
Domestic and irrigation water services:
Meter Size | Fee Amount |
---|---|
¾″ meter | $4,833.77 |
1″ meter | $6,117.76 |
1 ¼″ meter | $9,101.77 |
1 ½″ meter | $12,053.44 |
2″ meter | $21,914.87 |
Water Development Fee may be waived if conditions of Resolution No. 87-322 are met.
Water Development Fee credit is given for existing water service connections.
Service sizes larger than 1.5” are offered only under special circumstances, and if approved a fee quote will be provided.
Size | Easement Tap* | + | Meter** |
---|---|---|---|
1" | $1,822.00 | + | $672.00 |
1.5" | $2,265.00 | + | $923.00 |
*Contractor excavates and exposes the water main for the City to install tap, corporation stop, water pipe from main to point of service and meter box. Contractor backfills trench and restores pavement. Incidentals work such as encroachment permit, traffic control is the Contractor’s responsibility.
** City removes idler, provides and installs meter. If no meter box exists Contractor is responsible for providing and installing the box and all associated fittings per City Standard Detail W-402.
1" to 3" = $1,851.00
¾” to 2" = $254.00
This fee is charged with every residential demolition permit, City crews will cut service on customer side of curb stop.
$5,877.00
Only for 1” landlocked services, includes abandonment of existing service and installation of new full-service tap, and meter. Applicant is responsible for obtaining any required easements and for routing their service to the new meter box location.
~
Drainage Basin Type | Fee Amount |
---|---|
Combined Sewer Service Area | $1.35 per sq. ft. of increased imperviousness (Offset by Combined Sewer Service Area Sewer Development Fee) |
Pumped Basin* | $0.0609 per sq. ft. of increased imperviousness |
Gravity Basin* | $0.0373 per sq. ft. of increased imperviousness |
*Applies to areas of the Combined Sewer System with separated City drainage basins.
Either A or B:
4" Easement Tap = $1,350.00
Contractor excavates and exposes the sewer line for the City to install a sewer tap. Contractor then installs sewer service connection from main line to the point of service, backfills trench and restores pavement. Incidentals work such as encroachment permit, traffic control is the Contractor’s responsibility.
Sacramento Area Sewer District (SASD)
10060 Goethe Road, Sacramento, CA 95827
Administration – (916) 876-6000
Permit Services – (916) 876-6100