SITE NAVIGATION
- Commercial Addition
- Commercial New Building
- Commercial Re-roof Permits
- Commercial Remodel
- Commercial Tenant Improvement
- Pools (Residential or Commercial)
- Pre-Engineered Patio Cover
- Residential Addition
- Residential Bathroom Remodel
- Residential Electrical Panel
- Residential HVAC Change Outs
- Residential HVAC Cut-In (New Installation)
- Residential Installation of New Gas Line
- Residential Kitchen Remodel
- Residential New Building
- Residential Re-Pipe (Whole House or Partial)
- Residential Re-Wire (Whole House or Partial)
- Residential Re-roof
- Residential Remodel
- Residential Sewer Service (Replacement or Repair)
- Residential Water Service (Replacement or Repair)
- Revisions (Residential or Commercial)
- Signs
- Site Built Patio Cover
- Water Heater (Residential or Commercial)
Deferred Submittals (Commercial Only)
This activity is used to track portions of a scope of work which were not included in the initially submitted drawing package. Some examples of potentially deferrable portions of a project are:
- Fire Sprinklers
- Stair Systems
- Fire Alarm Systems
- Roof Trusses
Deferred submittal activities are not permits. Any scope of work presented as a deferred submittal must be clearly listed as deferred on the cover sheet of the permit plan set from which it was deferred.
Due on all commercial deferred submittals permits
Fees and taxes required for deferred submittals (commerical only)
Building permit fee (intake)
Building plan review fee - hourly
Technology fee
Due in some circumstances on deferred submittals (commercial only) permits
Fees and taxes due in some circumstances on deferred submittals (commercial only) permits, including requirement details
Fire Department plan review fee
The fee is exclusively calculated and assessed by the Fire Department and varies based on the number of hours expended in Fire Plan Review.
Fire Department administrative fee
This fee is exclusively calculated and assessed by the Fire Department. It is charged on most activities for which the Fire Department performs plan review and/or field inspection.
Landscape document package application fee
Charged if submitted plans include landscape sheets.
Public works fee
This fee is calculated by the Public Works Staff in the Development Engineering Section. The fee is a function of the number of plan review hours expended reviewing the project.
Utilities
This fee is calculated by Utilities Department Staff in the Utilities Development Services section. The fee is a function of the number of plan review hours expended reviewing the project.