SITE NAVIGATION
- 9th Street Separated Bikeway Project
- Auburn Boulevard at Arcade Creek Bridge Replacement Project
- Broadband Internet Access Expansion Project
- Broadway Bridge Project
- Broadway Complete Streets
- Broadway Vision Zero
- Carlson Drive Rehabilitation Project
- Central City Mobility Project
- Envision Broadway in Oak Park Complete Street Project
- Florin Road Vision Zero Rehabilitation
- Florin Road Vision Zero Safety Project
- Folsom Boulevard Safety Improvements Project
- Franklin Boulevard Complete Street Project
- Franklin Boulevard Gap Closure Project
- Fruitridge Road Improvement Project
- H Street Bikeway to Sacramento Valley Station
- H Street Bikeway to Sacramento Valley Station
- I Street Bridge Replacement Project
- Interstate 5 / Richards Boulevard Interchange Project
- Lampasas Avenue & Rio Linda Boulevard Intersection
- Little Saigon Gateway Project
- Marysville Boulevard Vision Zero
- Morrison Creek Revitalization Study
- Ninos Parkway Phase 2
- SVS Commuter Bus Stop Consolidation Project
- Sacramento River Parkway Project
- Stockton Boulevard Safety and Transit Enhancement Project
- T Street Bikeway Gap Closure Project
- The Del Rio Trail Project
- Two Rivers Trail Project
- Vision Zero School Safety Project - Phase 2
La Mancha Way Corridor Improvement Project
Project overview
The objective of this project is to enhance safety of the roadway segment of Valley Hi Drive and La Mancha Way bounded to the south by Bruceville Road and to the north by Creek Centre Court. The project consists of installing a new traffic signal and pedestrian crossing, curb extensions, pedestrian median fencing, and extending the raised medians.
Existing conditions
Valley Hi between Mack Road and Bruceville Road is a six-lane collector with a 35-mph posted speed limit. There is a raised median to limit conflict zones and vehicle crossing, and a desire for pedestrians to cross between the two shopping centers on either side of the street.
La Mancha way north of Mack Road also has a raised median, but only for the 270 feet beyond its intersection with Mack Road. This section of La Mancha Way starts with six lanes at its intersection with Mack Road, but through lane reductions becomes a two-lane local street by Creek Centre Court with a 40-mph posted speed limit.
Project benefits
The Valley Hi Drive - La Mancha Way Corridor Improvement Project will make several improvements that will benefit the community including:
- Improved pedestrian crossing
- Reduced pedestrian exposure
- Safety improvements for people walking and driving
Project map
open_in_full
Funding
The City was awarded federal funding for the design and construction of the Valley Hi Drive - La Mancha Way Corridor Improvement Project.
Schedule
Spring 2023: Plan, Specification and Estimate, Right of Way Coordination
Summer 2024: Begin Construction
Contact
James Kragh, P.E.
Associate Civil Engineer Public Works – Engineering Services
Funding and Project Development
jmkragh@cityofsacramento.org