SITE NAVIGATION
- 9th Street Separated Bikeway Project
- Auburn Boulevard at Arcade Creek Bridge Replacement Project
- Broadband Internet Access Expansion Project
- Broadway Bridge Project
- Broadway Complete Streets
- Broadway Vision Zero
- Carlson Drive Rehabilitation Project
- Central City Mobility Project
- Envision Broadway in Oak Park Complete Street Project
- Florin Road Vision Zero Rehabilitation
- Florin Road Vision Zero Safety Project
- Folsom Boulevard Safety Improvements Project
- Franklin Boulevard Complete Street Project
- Franklin Boulevard Gap Closure Project
- Fruitridge Road Improvement Project
- H Street Bikeway to Sacramento Valley Station
- H Street Bikeway to Sacramento Valley Station
- I Street Bridge Replacement Project
- Interstate 5 / Richards Boulevard Interchange Project
- La Mancha Way Corridor Improvement Project
- Lampasas Avenue & Rio Linda Boulevard Intersection
- Little Saigon Gateway Project
- Marysville Boulevard Vision Zero
- Morrison Creek Revitalization Study
- SVS Commuter Bus Stop Consolidation Project
- Sacramento River Parkway Project
- Stockton Boulevard Safety and Transit Enhancement Project
- T Street Bikeway Gap Closure Project
- The Del Rio Trail Project
- Two Rivers Trail Project
- Vision Zero School Safety Project - Phase 2
Ninos Parkway Phase 2
Project description
The project will complete a multi-use trail linking residential neighborhoods to neighborhood schools. The current Ninos Parkway (Trail) ends at San Juan Road, this project will extend the trail to Citrusparke Avenue/Parkchannel Way in the Parkebidge Development though the existing power transmission line corridor.
Benefits
Construction of a fully accessible paved multi-use trail, 12-foot wide with walkable shoulders, approximately half-mile long. Construction of new pedestrian traffic signal, including accessible curb ramps, center refuge island, and crosswalk at San Juan Road. The new signal will tie into the existing signal network to allow better efficiency. Construction of a new box culvert will cross the San Juan drainage ditch at the north end of the trail. Two traffic speed feedback signs will be installed along San Juan Road to help drivers manage their speed around the road curve.
Costs and funding
The estimated total project cost is $2.5 million.
Schedule
Construction is scheduled to begin in Summer 2024 with completion in Fall 2024.
Contact
Avtar Banwait, Assistant Civil Engineer
Office: 916-808-6805
Email: ABanwait@cityofsacramento.org