SITE NAVIGATION
- 9th Street Separated Bikeway Project
- Auburn Boulevard at Arcade Creek Bridge Replacement Project
- Broadband Internet Access Expansion Project
- Broadway Bridge Project
- Broadway Complete Streets
- Broadway Vision Zero
- Carlson Drive Rehabilitation Project
- Central City Mobility Project
- Envision Broadway in Oak Park Complete Street Project
- Florin Road Vision Zero Rehabilitation
- Florin Road Vision Zero Safety Project
- Folsom Boulevard Safety Improvements Project
- Franklin Boulevard Complete Street Project
- Franklin Boulevard Gap Closure Project
- Fruitridge Road Improvement Project
- H Street Bikeway to Sacramento Valley Station
- H Street Bikeway to Sacramento Valley Station
- I Street Bridge Replacement Project
- Interstate 5 / Richards Boulevard Interchange Project
- La Mancha Way Corridor Improvement Project
- Lampasas Avenue & Rio Linda Boulevard Intersection
- Little Saigon Gateway Project
- Marysville Boulevard Vision Zero
- Morrison Creek Revitalization Study
- Ninos Parkway Phase 2
- SVS Commuter Bus Stop Consolidation Project
- Sacramento River Parkway Project
- Stockton Boulevard Safety and Transit Enhancement Project
- T Street Bikeway Gap Closure Project
- The Del Rio Trail Project
- Two Rivers Trail Project
- Vision Zero School Safety Project - Phase 2
L and N Streets Bikeways Project
The City of Sacramento is advancing efforts to make biking safer and more accessible in the Central City with the L and N Streets Bikeways Project. This project will restripe and reconfigure key segments of L Street and N Street to install Class IV separated bikeways—dedicated bike lanes that use physical barriers to protect people biking from traffic.
These upgrades are part of a larger vision to create a connected, low-stress bikeway network in Sacramento’s urban core, making it easier for people of all ages and abilities to choose active and sustainable modes of transportation.
open_in_full
L & N Bike Network Map
Project Overview
The L and N Streets Bikeways Project includes:
- N Street (Eastbound): Installing Class IV separated bikeways from 5th to 10th Street and 14th Street to Alhambra, working in tandem with the existing J Street eastbound bikeway to complete a lane reduction and a vital east-west connection.
- L Street (Westbound): Installing Class IV separated bikeways from 14th Street to 21st Street Flexible Design: Some individual blocks may use buffered Class II bike lanes if Class IV designs are not feasible due to driveways, loading zones, curbside constraints, or street width.
- ADA Accessibility Improvements: Upgrade all non-compliant curb ramps on L Street within the project limits to meet current ADA standards and install Accessible Pedestrian Signals (APS) at every intersection, providing audible and tactile crossing cues to improve accessibility and safety for all pedestrians.
- Funded by state and local programs, including the Local Partnership Program and Affordable Housing & Sustainable Communities (AHSC).
These improvements will work in coordination with a separate project led by the State of California to deliver continuous protected bikeways along these important corridors.
Project Benefits
- Enhanced Safety: Physically separated bikeways offer a more comfortable and safer experience for people biking on busy downtown streets
- Accessibility Improvements: New ADA-compliant curb ramps will enhance access for pedestrians, including seniors and people with disabilities
- Cleaner, Greener Transportation: Encouraging biking reduces traffic congestion and greenhouse gas emissions
- Accessible Pedestrian Signal (APS) Upgrades: Install or upgrade APS, which provide audible, tactile, and vibrating crossing cues to improve safety and accessibility for pedestrians with vision impairments.
- Central City Specific Plan Implementation: This project directly supports the transportation goals outlined in the Central City Specific Plan (CCSP) and is covered under the CCSP Environmental Impact Report
Proven Experience
The City of Sacramento has a strong track record of delivering similar bicycle and pedestrian infrastructure:
Central City Mobility Project (Completed 2023):
- Installed Class IV separated bikeways on key downtown streets and upgraded 200 curb ramps. Funded by state programs, including the Local Partnership Program and Affordable Housing & Sustainable Communities (AHSC).
Broadway Complete Street Project (Completed 2024):
- Reduced traffic lanes and added buffered bike lanes, safer crossings, and ADA upgrades, connecting Broadway to the wider bike network and downtown core.
Stay Informed
The City will continue to engage the public as this project moves through the design and construction process. Your input helps shape safer, more sustainable streets for everyone. For questions or updates, please contact:
Hotline: (916) 314-6339
Email: landnbikeways@gmail.com