Sacramento River East Levee Improvements
FAQs, visit the Sac Levee Upgrades website or contact the USACE Public Affairs Office at (916) 557-5100.
Lower American River Erosion Protection Construction – Access at Glenn Hall Park
Questions or comments regarding the levee construction activity can be directed to USACE at:
USACE Public Affairs Office
Phone: (916) 557-5100
Email: spk-pao@usace.army.mil
24th Street Bypass Park Fitness Area
Project address: 2501 New Market Dr. The project consists of installing an outdoor fitness area with six pieces of fitness equipment, allowing for 13 people of various fitness abilities and wheelchair accessible, to use the areas at the same time, a 25’ x 25’ shade umbrella covering. The project is anticipated to be completed by March 2026. Project manager: Dennis Day at DDay@cityofsacramento.org
Crocker Park
Installation of new walkways for a future sculpture garden, new irrigation, electrical service for events and food trucks, central irrigation controller, booster pump, seating areas, new turf. No trees will be removed. Anticipated completion will be at the end of 2026. Project Manager: Jeff Nittka at jnittka@cityofsacramento.org
Garcia Bend Park Improvement
Renovation of the two large soccer fields, paving, updating the irrigation, new irrigation booster pump, and central irrigation control system. Improvements are anticipated to be completed at the end of July 2026. Project Manager: Jeff Nittka at jnittka@cityofsacramento.org
Lakeview Park
Project address, 355 Sun Harbor Circle. This is a new 1.89 acre park in the Greenbriar Phase 2 development. The improvements at this park consist of group picnic area, open plaza, playground, walkway, open turf, seating, and shade trees. Project anticipated to be completed at the end of 2025. Project Manager: Jeff Nittka at jnittka@cityofsacramento.org and Kathryn Kim with Wood Rodger kkim@woodrodgers.com
Lakeshore Park
Project address, 5424 Lopez Lake Way. This is a new 2.22 acre park in the Greenbriar Phase 2 development. The improvements at this park consist of two group picnic area overlook a lake, playground, walkway, open turf, seating, and shade trees. Project anticipated to be completed at the end of 2025. Project Manager: Jeff Nittka at jnittka@cityofsacramento.org and Kathryn Kim with Wood Rodger kkim@woodrodgers.com
Meadows Park Phase 3 Improvements
Meadows Park is an existing 11.23-acre community park located at 1840 North Breezy Meadow Drive. Phase 3 improvements include the addition of a basketball court, a tennis court, pickleball courts, park lighting, concrete walkways, site furnishings, a drinking fountain, landscaping, and irrigation. Construction is currently underway and is expected to be completed by winter 2025. For inquiries or updates, please contact Project Manager Tin-Wah Wong at twong@cityofsacramento.org
Ninos Park Playground Replacement
Project address: 705 Northfield Drive. This project consists of the demolition and replacement of the existing tot-lot and play area within the park. The project is anticipated to be completed by March 2026. Project manager: Levi Rynearson at lrynearson@cityofsacramento.org
North Natomas Regional Park Fields 1-3 Lighting
Project address: 2501 New Market Dr. The project consists of installing sports field lighting on fields 1, 2, and 3, and two bull pens on field 1. The project is anticipated to be completed by the end of February 2026. Project manager: Dennis Day at DDay@cityofsacramento.org
Oki Park Urban Farm
Project address: 8484 Lake Forest Dr. The improvements consist of preparing the open space for a ¾-acre seasonal Urban Farm to be managed by Norcal Resist, which will establish a pilot project. Improvements will include paving half the length of the planned 12’ wide bike trail, with decomposed granite shoulders, an accessible drinking fountain with a bottle filler, bike racks, two trash receptacles, two picnic tables, park rules signs, an irrigation system, and discing for the proposed urban farm area in preparation for planting. Construction to begin in March and be completed in April 2026. Project manager: Dennis Day at DDay@cityofsacramento.org.
Renfree Field Renovations at Del Paso Regional Park
Project address: 3365 Auburn Blvd. We are underway on a transformative project that will enhance our community's recreational offerings! This initiative will replace the current baseball field with a state-of-the-art 375-foot youth baseball field, a dedicated practice field, a versatile overlaid soccer field, one basketball and four pickleball courts. In addition to sports facilities, we will revamp half of the existing parking lot on Bridge Road, bringing it up to modern standards with durable asphalt paving, striping, concrete curbs, and improved drainage systems, irrigation well, booster pump, new electrical service, and low water use landscape and native shade trees. The project is anticipated to be completed in summer 2026. Project manager: Dennis Day at DDay@cityofsacramento.org
Shorebird Park Shade Canopy
Project address: 3200 Kittiwake Dr. The project consists of installing a 35’ x 35’ by 16’ high playground shade canopy. Project anticipated to be completed by year-end 2025.Project manager: Dennis Day at DDay@cityofsacramento.org
Sierra II Playground Shade Canopy
Project address: 2471 4th Ave. The project consists of installing a 24’ x 30’ and a 30’ x 30’ playground shade canopies over the existing play structures. This project also includes the removal of the existing 6’ chain link fencing and replacement with 3’ high tube steel fencing to match existing fencing surrounding the play area. Project anticipated to be completed by May 2026. Project manager: Levi Rynearson at Lrynearson@cityofsacramento.org
Southside Stage and Electrical Improvements
Project address, 2115 6th Streety. The project consist of installation of new electrical upgrades for the stage and areas around the stage, new picnic area and accessible improvement for the stage. Project anticipated to be completed in October 2025. Project Manager: Jeff Nittka at jnittka@cityofsacramento.org
Sunhaven Park
Project address, 3624 Kona Kai Way. This is a new 2.4 acre park in the Greenbriar Phase 2 development. The improvements at this park consist of group picnic area, playground, walkway, open turf, seating, and shade trees. Project anticipated to be completed at the end of 2025. Project Manager: Jeff Nittka at jnittka@cityofsacramento.org and Kathryn Kim with Wood Rodger kkim@woodrodgers.com
Woodlake Park Lighting and Walkway Improvement
Project address, 500 Arden Way. The project consist of installation of a new perimeter walkway around the park parcel east of Oxford Street and perimeter site lighting. Project anticipated to be completed at the end of 2025. Project Manager: Jeff Nittka at jnittka@cityofsacramento.org